1、英文原文THE 6 LAYERS STEREO GARAGE DESIGN BASED ON OMRON PLCZhuoran Zhang Department of Electrical & Engineering Wuhan Polytechnic University Wuhan, China E-mail: Harry zzr Zhe Mao, Hailing Wan Department of Electrical & Engineering Wuhan Polytechnic University Wuhan, China E-mail:maozhe998 Abstractwith

2、 the development of the modern society, the number of the vehicles in these cities has been increasing with an exponential speed; especially the private cars, putting a great pressure on urban transportation and parking slot. This article is mainly concerned about the entire structure, running proce

3、dure and electrical system design including hardware and program design ideas for lifting-traversing stereo garage, which will not only shorten the developing period but also orient parking to centralization and automation direction; Owning some reference value.Keywords- Stereo Garage, Omron PLC, De

4、signInsufficient parking slots is resulted from the development of the cities, economy and transportation of the cities, the traditional garages are always making the use of the nature vacancy, in a community, the ratio between parking slots and residents is approximately 1:1, one parking slot for a

5、 family at least, in order to solve the contradiction that the parking slots using precious commercial land, the stereo mechanical garages with the advantage of the average parking slot takes of less area have been gradually in front of us. Compared with the traditional underground parking garage, t

6、he stereo garages have more advantages. First of all, the stereo garages can save more area. The traditional ways must be amassed driving path for vehicles, averagely, a car will take up 40m2 If we take multi-layers garage (6 layers) in to consideration, it is possible for 13 cars to park in the are

7、a of 50m2, which will save lots of land resources and land construction expenditure. Meanwhile, the stereo garage could guarantee the safety of the people and their cars. If there is anybody in the garage or the cars are not fully stopped, the system controlled by electrical equipment will not run e

8、ither. It means that, in the scale of the management, the mechanical garage could separate the people and vehicles, which makes it more systematically. Especially for underground garages, install this kind of garage will save a large area of illumination system, so it is also emerge conservation and

9、 environment protection.THE CLASSIFICATION AND IMPLEMENT BACKDROP OF THE STEREO GARAGEA.THE CLASSIFICATION OF THE STEREO GARAGEAccording to the present development of the stereo garage, the stereo garage is including lifting-traversing, roadway stacking, vertical lifting, vertical circulating, circl

10、e level circulation; The concept of the stereo garage is all from automatic logistic material transmitting system. 3The purpose of the stereo garage is to solve the parking problem in developed cities, that is make use of limited area to park more vehicles so as to save land resources of the cities

11、and manage the static transportation of the urban. This article gives out a way to design lifting-traversing stereo garage based on Omron PLC CP1H, which could extend to solve relevant projects.B. A BRIEF INTRODUCTION TO LIFTING-TRAVERSING STEREO GARAGE.The modularization concept is imported in lift

12、ing-traversing stereo garage. It can be designed into two to five layers or half underground type, the number of the slot is from tens to hundreds. This kind of garage is suitable for both above ground and underground, the characteristics could be generalized as less occupation of land, simple struc

13、ture, flexible configuration, lower cost in construction, decoration and fire protection and short period of construction; Safe and convenient for saving and taking cars; Smoothly operation, lower noise during running. 4 It is also appropriate for commercial, bureau and residential use. The safety e

14、quipment mainly is photoelectrical sensors, limiting displacement protector and emergency switch.C. THE ENTIRE FRAME OF THE SYSTEMAs the fig. l representing, besides the central controller PLC, the stereo garage system could be divided into three sections: I. Mechanical System; It includes column, b

15、eam, carrying board, vehicle frame, hooks and etc. II. Electrical System; this section is the core of this article, which controls the whole system to operate. III. Touching Panel; it is the port from which operators and the system exchanging messages, operators could not only operate the system, bu

16、t also in the situation of the malfunction, it could let operator enter the manual or debugging mode.Figure 1. The structure of the system Figure 2. Touch Screen (Auto running and Manual) THE MAIN HARDWARE OF THE SYSTEMWe mainly use the Omron PLC CPH1, on considering the control requirement and the

17、cost, we adopting CP1HX40DR-A PLC, the programming ways are ladder diagram or ST instruction list. The instruction length is 1 to 7 steps per instruction, each I/O relays has 1600 ports, USB 1.1 for communication.The display part, we import screen of WEINVIEW MT6056i series, the screen material is T

18、FT, 5.6 inches, and the resolution is 320x234, with USB2.0 port supporting downloading. The frequency of the CPU is 400 MHz, 128RAM.D.THE SYSTEM STR UCTURE AND FUNCTIONSThe mechanical parts cooperating with electrical system are carrying board, hooks and chains. There are 6 slots on each layer besid

19、es 7 slots on the top layer, totally 37 slots, the purpose for one slot empty on each layer is that making enough space for carrying board to move. The carrying boards of the first floor only design to traverse, also the top floor carrying boards are only supposed to lift. The other carrying boards

20、among these floors are designed to life and traverse. In this way, this system could achieve the saving and taking from any slots among these 6 layers.In addition, this system has a touch screen system, which switches between auto run and manual debugging mode. Under the auto run mode, it could sele

21、ct a certain slot to accomplish saving and taking behavior, at the same time, monitoring the operation of the system. (Green words System Running in auto mode without malfunction). When failure occurs, the system seized and on screen flashing yellow failure code with red backdrop, with the help of t

22、he failure code, the professional operator could recognize and eliminate the failures promptly and accurately. On considering more authorities are given in manual debugging mode, to preclude unprofessional persons enter the mode by chance, before enter the mode, there is a cipher verification, in wh

23、ich the sequence could be set by ourselves. This would protect the system from potential dangers.Figure 2 is the graph of system auto running, manual and debugging. . THE COMPOSURE OF THE ELECTRICAL SYSTEMA. STRONG ELECTRICITY SYSTEMThe strong power system includes power supply, protection and drivi

24、ng mechanism, here is electronic motors. Installing XJ3-D on the forepart of the power supply wire, which is used to protect phase sequence of the three-phase voltage, so that guarantee the right rotation of the motors. Moreover, the motors on some layers use the same three-phase voltage.B.THE SET O

25、F THE MOTORSThere are 6 traversing motors on the first layer, 6 traversing motors for 2 to 5 layers each, and so it is with lifting motors for 2 to 5 layers. The top layers have only 7 lifting motors. After setting the motors, mark every motor. For example, the motor driving the third slot of the se

26、cond layer, we mark it with 23, the relay before the motor are named KM23. Here series connect all the motors thermal protection, any motors problem will stop the system. In this way, it has no influence on the stability of the system, but lowers the cost. At the same time, make it easier to find th

27、e problems. (What we need to do is press the thermal protection switch one by one).C .WEAK POWER SYSTEMThe weak power system is also the control system, which are mainly the PLC mode and its 5 extended modules, also the sensors. As the figure below, on the right is the input part, DC 24V, on the lef

28、t, is the output section, AC 220V, to connect with contactors and drive them. These devices functions have close relationships with the entire systems control requirements. On the above of the graph, the protection equipment are emergency switch, installed beside the touching panel, emergency only,

29、trigger it, the system stops; Front and back photoelectrical sensors, which are used to detect people or unidentified objects breaking into the system, if this happens, the system would stop then response with photoelectrical failure, the goal is to protect the people and the vehicles. The phase seq

30、uence protection has been illustrated before; Over current protection normally activated under the motor stuck; All the margin switches series connected, cult the main power when any carrying board exceed the limiting position.Limit switches including up ones and down ones or left and right limit sw

31、itches. In order to achieve the controlling requirements, the level limit switches are installed on the both side of the each slot frame, while the vertical limit switches are installed on the chain which attached to the motor. It is necessary to point out that the first layer only installed down an

32、d left right limit switches, the top layer only installed up switches these switches could sense the position of the carrying boards, helping to finish the lifting and traversing control; Hook position sensors is to fix the vehicles and sense the slot empty or not.The output points00 04 05 06 07 are

33、 to select different phase for each layer, so control the motors rotation ways.Figure 3. PLC Modules (Segment)There are other 4 extended modules, which only give more I/O ports to the system, similar to this main part. . OPERATION PROCEDUREA. TAKING PROCEDUREAs far as the first layer concerned, it i

34、s only designed to traverse, so as to make space to upper layers carrying boards to move downward. So do the other layers, which are designed to traverse. When traversing meet the requirements, lifting mechanism will run to put the carrying board down, finishing the saving and taking procedure. Duri

35、ng the procedure the photoelectrical sensors are open and will behave as fore part has explained. In figure 2A, is the taking condition, at this time Loading will flash until the taking procedure finishes.When we enter 51, the system will distinguish whether the operation is a taking or a saving acc

36、ording to the hook of the 51 slot. Then prints the message responded to the state of the hook on the screen, the operator could confirm the operation or cancel it. On confirming, the 51 carrying board will wait for its downward boards to finish the traversing move then moving down. In addition, a ti

37、mer is added to this control module in order to preclude level limit switches malfunction, resulting into the traversing move time up. If the time for traversing move exceeds the set time, the system will warn the operator traversing move time up which displays on the screen, the operator could chec

38、k out the failure. The up limit switches are used to sense whether the carrying boards are stopped at their routine slots, which the level switches cant finish. Maybe one carrying board stuck between two layers. Only do all the upper layers carrying boards stop at their routine slots, the selected c

39、arrying boards lifting move is activated. A timer is also set into the lifting control, with the same function as traversing timer. The elevator carries the vehicle down to the ground, release the hook, now the photoelectrical signal shut down, and waiting for the owners to take their vehicle. On dr

40、iving away the vehicle and operators confirming the photoelectrical signal resumes, the carrying board back to its slot from the down way.Figure 4. The flowchart of the taking and saving procedureB. SAVING PROCEDUREThe saving process is based on taking procedure, so they are familiar; the only diffe

41、rence is the hook move. . SOFTWARE PROGRAMMING AND PROGRAMMING ENVIRONMENTA.SOFTWARE PROGRAMMING ENVIRONMENT AND ITS LANGUAGEIn this system, we choose Omron CX-ONE 3.0 to program the PLC. The language for programming is classic ladder diagram. On considering the stereo garages are installed in diffe

42、rent condition and requirement of different users, the scale of the stereo garages should be flexible, for example different layers or slots. In order to meet the different scales requirements, the program is modularized, only need to change the I/O ports, the logical relations in the ladder diagram

43、 are fixed. In this way, it is not only with highly compatibility but also shortens the period to develop relevant designs and make it easier to debugging and repair.B.MODULARIZED PROGRAMConditional jumps are widely used in the programming; the entire program consists of different modules, on certai

44、n conditions, the program jumps.As illustrated before, there are only two movements for a carrying board, lifting or traversing, beside the boards of first and top layers. The condition for the fifth could traverse is all the upper layers slots up limiting switches closed. Then Traverse OK is activa

45、ted, and then the program will make analysis of the operation until meet set conditions, the program jumps. For the lifting movements are always with the downward movements, so program the downward standards, the system will run. The entire program is programmed with this method, above the passage,

46、is only a traversing OK and vertical move OK module. Similarly, modules of a fixed slot, for example slot 21. 21 Traversing Move, 21 Vertical Move; for whole system, Emergency Stop and Protection, Button Select, System Monitor and Debugging modules, which cooperate with each other to accomplish the

47、control and monitor.Figure 5. Monitoring and Display module (Segment)Fig. 5 is the segment program of the monitoring module, all the motors protection series connected, so are the phase sequence protection and margin switches. Any of them change; PLC will transfer messages to the screen, which displ

48、ays. Meanwhile, cults off the main KM, the system stops. .A BRIEF SUMMARYThis paper introduces lift shifting type six floors of three-dimensional garage design method based on Omron CP1HX40DR-A controller, completing the requirements of three-dimensional garage for city vehicle management toward the

49、 direction of automation and centralization. This design can be used to restore occupied pavement, reduce preempting, and ensure safety, in addition that it could reduce traffic congestion time, reducing the injury. On this basis, the problem has been thoroughly eliminated, including various vehicles disorderly stopping and parting in disorder, and the appearance of parking places with dirty, disorderly and poor, t

展开阅读全文
相关资源
相关搜索
资源标签

当前位置:首页 > 学术论文 > 外文翻译(毕业设计)

版权声明:以上文章中所选用的图片及文字来源于网络以及用户投稿,由于未联系到知识产权人或未发现有关知识产权的登记,如有知识产权人并不愿意我们使用,如有侵权请立即联系:2622162128@qq.com ,我们立即下架或删除。

Copyright© 2022-2024 www.wodocx.com ,All Rights Reserved |陕ICP备19002583号-1 

陕公网安备 61072602000132号     违法和不良信息举报:0916-4228922